<linearGradient id="sl-pl-stream-svg-grad01" linear-gradient(90deg, #ff8c59, #ffb37f 24%, #a3bf5f 49%, #7ca63a 75%, #527f32)
0%
Loading ...
JR Automation

JR Automation

Size of building: 45,000 SF   This 45,000 SF facility houses JR Automation Operations Center. Thomas Mechanical and Fire Protection was awarded this Project to install (10) gas fired Package A/C units, (4) Exhaust fans, (2) mini splits, Plant air compressor with 1,040...
ERA Contact

ERA Contact

Size of building: 55,000 SF   This 55,000 SF facility houses era Contact’s north American operations. Thomas Mechanical and Fire Protection was awarded this Project to install (9) gas fired Package A/C units with zone controlled VAV’s, (9) Exhaust fans, (2) mini...
Muffin Mam

Muffin Mam

Location: Laurens, SC Size of building: 100,000 SF facility with a 5,000SF office; 18,000SF freezer; and 10,000SF cooler   This building provides an all-in-one facility – allowing Muffin Mam to manage, produce, decorate, and store all of their products in one...
Clemson University Soccer Operation Facility

Clemson University Soccer Operation Facility

Location: Clemson, SC Size of building: 12,995 SF This facility is the 12,995 SF home of the highly accomplished men’s and women’s soccer programs at Clemson University including locker rooms, meeting rooms, equipment rooms, coaches’ offices and player lounges. Thomas...
Borg Warner Cafeteria Reconstruction

Borg Warner Cafeteria Reconstruction

Location: Seneca, SC Size of building: 25,400 SF After a Tornado nearly destroyed the Owner’s facility in Seneca, SC a complete reconstruction was immediately underway with aggressive deadlines. Thomas Mechanical performed the HVAC and Fire Protection scopes of work...