Nissin Foods

Our team executed a massive mechanical upfit for Nissin Foods’ 640,000 SF high-volume manufacturing facility. We installed over 400,000 SF of custom ductwork and a high-capacity cooling network to manage the facility’s intensive thermal loads. By deploying specialized make-up air units and an extensive industrial ventilation package, we provided the precise air quality and temperature […]
FN America

Our work for FN America provided the essential mechanical and fire protection infrastructure for their combined 125,000 SF+ gun manufacturing and administrative facility. We managed the installation of facility-wide HVAC, industrial gas piping, and high-capacity compressed air systems to support advanced assembly operations. To finalize the life safety scope, we deployed a complete fire sprinkler […]
John Dodd

This multi-tenant project required a specialized approach to industrial air management to accommodate the varying needs of the facility’s occupants. For the transmission and recycling centers on-site, we deployed a network of oversized industrial fans designed to maximize circulation throughout the massive footprint. This strategic mechanical installation ensures optimal air quality and personnel comfort, supporting […]
ERA Contact

This 55,000 SF project for era Contact’s North American operations showcases our expertise in large-scale industrial integration. Our scope included the installation of a sophisticated HVAC network featuring nine gas-fired units with VAV zone controls, supported by specialized exhaust and cooling systems. We also delivered a mission-critical plant air system with all associated piping and […]
Absolute Haitian

This facility serves as a showroom and testing facility for new injection molding equipment. This project involved the brand new construction of a main southeast location to showcase, test, and store Absolute Haitian’s injection molding machines. The HVAC system installed included new chillers with chilled water piping and pumps, hot water piping and pumps, condensing […]
Samsung Complex 2

As a core component of Samsung’s 340,000 SF manufacturing campus expansion in Newberry, SC, this facility serves as a massive logistics hub for raw and finished materials. Our team delivered a high-capacity climate solution featuring 23 packaged rooftop units, a heated make-up air unit, and 22 high-volume low-speed (HVLS) fans to ensure consistent airflow throughout […]
Greenwood Fab & Plating

Our team provided a full-scale mechanical and process-utility package for Greenwood Fab & Plating’s newest production hub. Designed to handle the unique demands of chemical plating and storage, the facility’s infrastructure includes advanced chilled and hot water systems, high-efficiency steam boilers, and radiant gas heating. By integrating these complex systems through a modern Building Management […]
Greenville Tech Building 102

Our work on the renovation and addition of Greenville Tech’s Building 102 highlights our expertise in complex educational facility renovations and additions. We delivered a complete mechanical replacement, outfitting the building with new chilled and hot water systems, high-efficiency condensing units, and custom-engineered ductwork. The integration of variable volume air terminal units and centralized building […]
Ace Hardware

Like previous projects for ACE Hardware that we have done, this new Ace Hardware facility in Williamston, SC really stood out with our team delivered a mechanical and life safety solution that blends high-performance functionality with modern retail aesthetics. The HVAC installation features a combination of high-efficiency split and mini-split heat pumps, supported by a […]
Prisma Health Building 255

This comprehensive 130,000 SF renovation for Prisma Health represents a masterclass in healthcare mechanical retrofitting. Our scope centered on the strategic replacement of aging infrastructure with a sophisticated hydronic system, featuring new chilled water piping and high-capacity air handling units. By carefully phasing our work, we maintained full building functionality throughout the construction process. The […]