Location
Spartanburg, SC
Year Completed
2025
Services
HVAC, Process Piping

John Dodd

Multi-Tenant Mechanical System Retrofit

This multi-tenant project required a specialized approach to industrial air management to accommodate the varying needs of the facility’s occupants. For the transmission and recycling centers on-site, we deployed a network of oversized industrial fans designed to maximize circulation throughout the massive footprint. This strategic mechanical installation ensures optimal air quality and personnel comfort, supporting the heavy-duty operational requirements of these distinct logistics and technical service providers.