The new 12,500 Fire Station South on BMW Manufacturing’s Greer Campus now allows the fire department to fully operate from inside the secured facility. Our team outfitted the facility with split-system air handlers and variable terminal devices for crew comfort, alongside dedicated dehumidification in the equipment room and infrared heating in the apparatus bays, as well as a vehicle exhaust ventilation system. The project features a commercial-grade exhaust kitchen ventilation hood. It is unified by a centralized building management controls system to ensure the station remains fully mission-ready.