Location: Greenwood, SC
Size of building: 25,000SF Warehouse and Lab Area
This expansion served primarily as the storage warehouse for the chemicals and materials needed for the lab testing and production area. Included in this expansion was the renovation and expansion of existing lab areas. The HVAC for this project included lab sensitive stainless steel ductwork; designated humidifiers and dehumidifiers; new chillers including chilled and hot water piping, as well as associated pumps; water cooled and heated air handling units; air transfer chambers; and inline duct heaters.