<linearGradient id="sl-pl-stream-svg-grad01" linear-gradient(90deg, #ff8c59, #ffb37f 24%, #a3bf5f 49%, #7ca63a 75%, #527f32)
0%
Loading ...

Borg Warner Cafeteria Reconstruction

Location: Seneca, SC

Size of building: 25,400 SF

After a Tornado nearly destroyed the Owner’s facility in Seneca, SC a complete reconstruction was immediately underway with aggressive deadlines. Thomas Mechanical performed the HVAC and Fire Protection scopes of work on this reconstruction of the cafeteria and training areas including a complete fire sprinkler system, packaged rooftop HVAC units, ductless split system units, ductwork and building management controls.