Location: Greer, SC
Size of building: 12,500 SF
The new 12,500 Fire Station South on BMW Manufacturing’s Greer Campus now allows the fire department to fully operate from inside the secured facility. The facility includes complete living quarters for the crew. HVAC systems including a split system air handling unit with air terminal devices, dedicated dehumidification unit, natural gas piping, gas-fire infrared heaters, kitchen hood, vehicle exhaust systems and building management controls.
